In the year 2002, solar PV power generation was somewhat of a miracle. It may not be the same for us now, but at that time, in Sunderbans, people were relieved from darkness by the ability of SPV panels, off-grid systems, and the tiring effort by our state’s Renewable Energy Development Agency who believed in us in terms of technical resolution and complete installation and commissioning of the systems. Four consecutive projects by year 2005 made us proud, which was glorified by our Honourable ex-President, Late APJ Abdul Kalam. He saw the future; he was excited to witness it with his own eyes.
Till now we have installed more than 3MWp of cumulative SPV installation, be it hybrid, off-grid or on-grid system, pioneering our last major installation of 1MWp at Lux Industries, Dankuni.